Wear Resistant Spraying System Running Track Hybrid PU Runway 15mm Thickness
Product Details:
Place of Origin: | Guangzhou, China |
Brand Name: | SDONG |
Certification: | IAAF / ITF / ISO9001:2008/ ISO14001/ ISO18001/ SGS |
Model Number: | SB02-601 |
Payment & Shipping Terms:
Minimum Order Quantity: | 500 sq.m |
---|---|
Price: | Negotiable |
Packaging Details: | Pack in barrel / carton/ fiber bag |
Delivery Time: | 10 days after your deposit |
Payment Terms: | L/C, T/T, Moneygram, Paypal, Western Union |
Supply Ability: | 10000 sq.m per Month |
Detail Information |
|||
Product Name: | Full PU System Running Track | Thickness: | 13-15mm(or Customized) |
---|---|---|---|
Other Material: | Waterproof Primer, Asphalt Base Sealer, PU Primer, Top Coat And Delineation Paint | Colour: | Red Color |
Feature: | Excellent Construction Performance, Good Leveling | Standard: | ISO9001:2008/ISO14001/ISO18001 Or SGS |
After-sale Service: | Online Technical Support, Onsite Installation, Onsite Training | Application: | Stadium, School Playground, Jogging Park,Multi-purpose Ground |
Base: | Cement Foundation | ||
High Light: | Wear Resistant Running Track,15mm Thickness Running Track |
Product Description
Hybrid PU Runway wear-resistant Spraying system Running Track
Synthetic Tartan Jogging Track 400m Standard Running Field Construction
Full PU Running track
The hybrid runway surface material is a new polymer synthetic material, which is now recognized as the world's best material for sports grounds. It has the advantages of high strength, good elasticity, good shock absorption performance, wear resistance, weather aging resistance, anti-slip, flatness and beautiful color. Because of the good sports characteristics of polyurethane runway. It has been widely used in international and domestic sports competitions, school playgrounds and national fitness venues.
Features:
1,Safe and environmental protection, no heavy metal and VOC emission.
2,Excellent construction performance, good leveling, can be used for a moderate period of time.
3,Has excellent weather resistance, wear resistance, excellent construction performance, good leveling, can be used for a moderate period of time;
4,With EPDM particles have excellent bonding strength;
5,Excellent overall performance after curing, can maintain excellent physical properties for a long time.
Other details
About Sdong synthetic running tracks
1.The running track or say all-weather athletic running track,is made from PU,synthetic material,including paint,additive,anti-oxygen additive,anti-aging additive, filling, rubber and so on.
2.The surface of running track is made by EPDM rubber granule or PU granule.
3.Plastic and rubber running track is good for sportsmen’s speed and technique, effective for improving sporting achievement, useful for protecting sportsmen form falling down with features of flatness, anti-press, good elasticity, steady performance of physic and chemistry, stand and long-lasting color, long using life.
4.From the pattern, they can be divided into mixing, ventilate, compound and so on. From the appearance, they can be divided into of granule, non-granule, ready-made.
5.The running track can be painted in red, or green, or blue. There are 13mm in competition area, 9mm in non-competition area.
6.For adding thickness area, it is 20-25mm. Running tracks are recognized as the best all-weather sports ground material in the world. Our running track products have been certificated by IAAF.
7.We can supply the professional and all-round service for you from material to installing technique and technician to installing machines.
Application
Professional type: for athletic field of Olympic, continental championship, professional training.
Standard type: for athletic field of high school, university, physical college, sports center, stadium.
Conventional type: for athletic field of primary school, high school, college, university, gymnasium.
Indoor, outdoor table tennis, basketball, badminton and other kinds of course.
Construction precautions:
1, Plan and control the amount of material per square.
2, In the outdoor construction should pay attention to changes in the weather, rain and below 5 ℃ is not suitable for construction. Avoid high temperature time construction in outdoor construction in summer.
3,The material should be sealed and stored in a place far from fire source.
4,The order of putting the material into the mixing barrel is: first group A, group B, drying agent and then put granules and other auxiliary materials.
Specification on Full Pour Running Track
No. | Test Item | National standard | Testing data | |
1 | Shock absorption | 30-50 % | 42 % | |
2 | vertical deformation | 0.6-2.5 mm | 2.2 mm | |
3 | skip resistance(BPN,20℃) | ≥ 47 | 51 | |
4 | Tensile Strength | ≥ 0.4 MPa | 0.45 Mpa | |
5 | Elongation at Break | ≥ 40 % | 68 % | |
6 | Flame Retardance |
Level I Burning diameter ≤ 50 mm |
Level I | |
7 | Benzene | ≤ 0.05 g / kg | Not detected | |
8 | Toluene and Xylene | ≤ 0.05 g / kg | Not detected | |
9 | TDI | ≤ 0.2 g / kg | Not detected | |
10 | heavy metals | Pb | ≤ 90 mg / kg | Not detected |
Cd | ≤ 10 mg / kg | Not detected | ||
Cr | ≤ 10 mg / kg | Not detected | ||
Hg | ≤ 2 mg / kg | Not detected |
Running Track