GUANGZHOU SHENGDONG SPORTS INDUSTRY CO., LTD. 86-020-37738503 robinliao@sdongsports.com
Rustproof Outdoor Court Surfaces EPDM Playground Rubber Granules Running Track

Rustproof Outdoor Court Surfaces EPDM Playground Rubber Granules Running Track

  • High Light

    Rustproof Outdoor Court Surfaces

    ,

    EPDM Playground Outdoor Court Surfaces

    ,

    Rubber Granules Outdoor Court Surfaces

  • Product Name
    Rustproof Outdoor Court Surfaces
  • Application
    Sports Venues
  • Material
    Environment Rubber Elastic Layer+environmental Rubber Wear Layer+PU Binder
  • Thickness
    9/13/15/25 MM
  • Color
    Red/blue/customizable
  • Base
    Cement Concrete / Asphalt Concrete
  • Standard
    ISO9001:2008/ISO14001/ISO18001/SGS
  • Features
    Water Permeable, Impact Resistance,Dustproof, Fadeless
  • Sample
    Free
  • EPDM Content
    11%-31%
  • Size
    Width:1~1.25M, Length:10~20M
  • Weight
    13-14 KG / SQM
  • Packed
    Packing In Roll/ Barrel /carton/ Fiber Bag
  • Warranty
    8-12 Years
  • Quantity Of Glue
    1.8 Kg/SQM
  • Place of Origin
    Guangzhou, China
  • Brand Name
    SDONG
  • Certification
    IAAF / ITF / ISO9001:2008/ ISO14001/ ISO18001/ SGS
  • Model Number
    SB01-801
  • Minimum Order Quantity
    500 sq.m
  • Price
    Negotiable
  • Packaging Details
    Pack in barrel / carton/ fiber bag
  • Delivery Time
    10 days after your deposit
  • Payment Terms
    L/C, T/T, Moneygram, Paypal, Western Union
  • Supply Ability
    10000 sq.m per Month

Rustproof Outdoor Court Surfaces EPDM Playground Rubber Granules Running Track

EPDM Playground Rubber Granules Running Track Rustproof Outdoor Court Surfaces

 

 

Product Description

 

Running Track Athletic Track

 

13mm thickness all weather fully cast in site sandwich type polyurethane synthetic running track system equivalent to synthetic consist of 9mm thick resilient cushion layer of polyurethane (PU) Binder bonded with SBR granules by paving machine and red ethylene propylene diene monomer( EPDM) granules size 2-4mm sprayed to permanently embedded on top of SBR layer in accordance to IAAF requirement.

 

 

Quick detail

 

Place of Origin Guangzhou, China
Brand Name Sdong
Packed Packing in Roll/ barrel /carton/ fiber bag
Sport Running track
Type Item prefabricated rubber running track
Thickness 9/11/13/15/18/20/25 MM
Size Width:1~1.25M, Length:10~20M
Warranty 12 Years Service Life
Matrial Environment rubber Elastic layer+environmental rubber wear layer
Weight 13-14KG/SQM
Quantity of glue 1.8 kg/SQM
Base: cement concrete / asphalt concrete
Certificate IAAF / ISO / LABOSPORT / CE / SGS /
Advantage Non toxic, fadeless, durable, seamless

 

 

Benefits:

  1. High UV weather resistance.
  2. Maximum abrasion resistance and permanent elasticity.
  3. High degree of adjustable area elasticity and point elasticity.
  4. Entire installation form one single partner,from the earthworks to the construction of the sub-base and finally the synthetic coat.
  5. Dedicated teams using state-of-the -art construction techniques install the right system professionally and on time.
  6. We cover the entire range of installation requirements,from all-weather surfaces for synthetic rubber running track surface material to high-performance surfaces for competitions and tournaments-cost-effectively,efficiently and quickly
  7. High - grip or nonslip surfaces.
  8. systems can be adjusted to be water-permeable or water-impermeable.consistent sports conditions,even under extreme temperature and weather conditions.the surface and usable within minutes after rain shower.

 

 

Full Pu Athletic Track Instructions:

 

Perfect integration with nature, only need to add a very small amount of water in the plastic, mix for 2 minutes evenly, spray on the base wait 24 hours to dry naturally, and then spray EPDM anti-skid surface twice, can be completed. Short construction period ,about 1 week.

 

 

Application Area

 

PU 4:1 Full-pu track material is used as a sandwich system which provides good force reduction and is construction on a casr in place basement of rubber crumb applied with clear PU binder, the base layer is sealed with a combination of rubber dust and two component PU material, with a final topping coating and EPDM rubber granule broadcast onto a flood coat of PU compound.

PU 4:1 Full-pu track material is also used as Full-PU system is a high performance system cast in place with two layer recycle SBR granule mixed with elastic PU flood coat and finished with a topping of EPDM rubber granule broadcast onto the PU compound.

 

 

Applications

  • Stadium
  • Sports ground
  • Sport center
  • Schools
  • Jogging park
  • Indoor facilities with Multi Sports Gaming
  • Indoor basketball courts
  • Billiards and Snooker sets
  • Indoor Badminton courts
  • Indoor volleyball courts
  • Ring football
  • Dance Arenas
  • Table Tennis Courts
  • Yoga and meditation
  • Children Play Areas

 

 

Project photos:

 

Rustproof Outdoor Court Surfaces EPDM Playground Rubber Granules Running Track 0Rustproof Outdoor Court Surfaces EPDM Playground Rubber Granules Running Track 1

 

 

 

FAQ:                                                                                                                        

Q1: Are you a factory or a trade company?
A1: We are an industry and trade company.Welcome to China factory inspection.

Q2: What is thickness for the IAAF Running Track?
A2: The International Standard thickness is 13mm. Other sizes are available as your request.


Q3: Can we get installation support if we have no own constructors?
A3: We can send salesmen and technical support to your country to assist the installation.


Q4: Are your running track materials safety?
A4: Yes, our materials are safe. Environmentally friendly and recyclable.

Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.

Q6: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.

 

Q7:What is the Production time?

A:It is about 10-15days.

 

Q8:What are the options for the base construction of a running track.?

A:The ground is based on asphalt or concrete.

 

Q9:What is the life Span for Running track?

A:The life span is about 10-15years.

 

Q10:I am Interested in Synthetic track surface,what is the best choice?

A: We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.

Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project
Sandwich system: EPDM broad be handwork,is professional than spray coat, enjoying great popular in the world market.
Full pour System: Best quality, Bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.

Prefabricated system: Is package by roll, Specification is 1.22*15m/20M, Strict request with base ground flat level. Professional for stadium international games. Like Olympic games.