IAAF Certification Rubber Tartan Running Tracks EPDM Jogging Track System

IAAF Certification Rubber Tartan Running Tracks EPDM Jogging Track System

Product Details:

Place of Origin: Guangzhou, China
Brand Name: SDONG
Certification: IAAF / ITF / ISO9001:2008/ ISO14001/ ISO18001/ SGS
Model Number: SB02-602

Payment & Shipping Terms:

Minimum Order Quantity: 500 sq.m
Price: Negotiable
Packaging Details: Pack in barrel / carton/ fiber bag
Delivery Time: 10 days after your deposit
Payment Terms: L/C, T/T, Moneygram, Paypal, Western Union
Supply Ability: 10000 sq.m per Month
Get Best Price Contact Now

Detail Information

Product Name: EPDM Jogging Track System Thickness: 9,11,13,15,18 MM
Application: Indoor&Outdoor Colour: All, Red/blue/customizable
Service Life: 12 Years Service Life Feature: Slipproof, Durable, High Elasticity, Impact Resistance
Material: Environment Rubber Elastic Layer+environmental Rubber Wear Layer Size: Width:1~1.25M, Length:10~20M
Weight: 13-14KG/SQM Granule Size: 1-2mm, 2-3mm, 1-3mm, Ect.
MOQ: 500 Sample: Free For Sample, But Freight Self-pay
Base: Cement Concrete & Asphalt Concrete
High Light:

Rubber Tartan Running Tracks

,

IAAF Tartan Running Tracks

,

EPDM Jogging Track System

Product Description

IAAF Certification Rubber Tartan Running Tracks EPDM Jogging Track System

 

 

Product Description

 

Running Track Athletic Track

 

13mm thickness all weather fully cast in site sandwich type polyurethane synthetic running track system equivalent to synthetic consist of 9mm thick resilient cushion layer of polyurethane (PU) Binder bonded with SBR granules by paving machine and red ethylene propylene diene monomer( EPDM) granules size 2-4mm sprayed to permanently embedded on top of SBR layer in accordance to IAAF requirement.

 

Name Sandwich Running Track
Base Ensure the foundation is flat and free of cracks
Primer Roll primer(0.15kg/M2)
Cushion layer Scraper Sealer (1.5-2.5kg/M2)
Top layer spray coat+EPDM granules (1.2kg+1kg) or Scraper self leveling (1.8-2.2kg/M2) then epdm granules broadcast (3.3kg/M2)
Line painting Usage : 0.01 kg /M2

 

 

Specification

 

1:2 PU top coat Color transparent/light yellow color liquid red color liquid
Viscosity(25℃,mpa s) 500-1500 15000-22000
Solid Content(%) ≥99 ≥99
Mixture Group A:Group B:Hardener=1:2:0--0.02
Surface dry time(25℃,h) ≤4
the whole system dry time(25℃,h) ≤8
Hardness JIS A 50-70
Tensile strength(Mpa) ≥3
Elongation at break ≥250
Flammability Bf1-S1

 

 

 

Applications

  • Stadium
  • Sports ground
  • Sport center
  • Schools
  • Jogging park
  • Indoor facilities with Multi Sports Gaming
  • Indoor basketball courts
  • Billiards and Snooker sets
  • Indoor Badminton courts
  • Indoor volleyball courts
  • Ring football
  • Dance Arenas
  • Table Tennis Courts
  • Yoga and meditation
  • Children Play Areas

 
Our Services
 
Best service: Any inquiry will be replied in 24 hours. Timely and professional service all the time. 
Best price: Reliable factory , direct selling,charming price for you! 
Free sample: Provide free sample within 2kg, you just need to pay for the sample Express fee.
After-sale service: Provide free trainning lesson for our oversea distrubitor or buyer, professional 
                              product & construction knowledge for you.

 

Running Track
 
IAAF Certification Rubber Tartan Running Tracks EPDM Jogging Track System 0
IAAF Certification Rubber Tartan Running Tracks EPDM Jogging Track System 1


FAQ:


Q1: Are you a factory or a trade company?
A1: We are an industry and trade company.Welcome to China factory inspection.


Q2: What is thickness for the IAAF Running Track?
A2: The International Standard thickness is 13mm. Other sizes are available as your request.


Q3: Can we get installation support if we have no own constructors?
A3: We can send salesmen and technical support to your country to assist the installation.


Q4: Are your running track materials safety?
A4: Yes, our materials are safe. Environmentally friendly and recyclable.


Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.


Q6: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
 
Q7:What is the Production time?
A:It is about 10-15days.
 
Q8:What are the options for the base construction of a running track.?
A:The ground is based on asphalt or concrete.
 
Q9:What is the life Span for Running track?
A:The life span is about 10-15years.
 
Q10:I am Interested in Synthetic track surface,what is the best choice?
A: We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.
Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project
Sandwich system: EPDM broad be handwork,is professional than spray coat, enjoying great popular in the world market.
Full pour System: Best quality, Bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.
Prefabricated system: Is package by roll, Specification is 1.22*15m/20M, Strict request with base ground flat level. Professional for stadium international games. Like Olympic games.

 

 

Want to Know more details about this product
I am interested in IAAF Certification Rubber Tartan Running Tracks EPDM Jogging Track System could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.