Prefabricated System Running Track Red Rubber Running Track Runway
Product Details:
Place of Origin: | Guangzhou, China |
Brand Name: | SDONG |
Certification: | IAAF / ITF / ISO9001:2008/ ISO14001/ ISO18001/ SGS |
Model Number: | SB02-603 |
Payment & Shipping Terms:
Minimum Order Quantity: | 500 sq.m |
---|---|
Price: | Negotiable |
Packaging Details: | Pack in barrel / carton/ fiber bag |
Delivery Time: | 10 days after your deposit |
Payment Terms: | L/C, T/T, Moneygram, Paypal, Western Union |
Supply Ability: | 10000 sq.m per Month |
Detail Information |
|||
Feature: | Eco-friendly, Durable, Recyclable | Product Name: | Prefabricated System Running Track Red |
---|---|---|---|
Standard: | ISO9001:2008/ISO14001/ISO18001/SGS | Weather: | All Weather Used |
Sport: | Playground, Athletics Runway, Sports Center | Thickness: | 10mm(4+6);13mm(4+9) |
Colour: | Red/Blue/Green Or Customized | Service Life: | 7-12 Years |
Base Requirement: | Cement Concrete Or Bituminous Concrete | Free Sample: | Available |
Material: | EDPM, PU Binder, Exercise Mats | EPDM Content: | 10%-35% |
Granule Size: | 1-2mm, 2-3mm, 1-3mm, Ect. | Roll Length: | 15m~20m |
Weight: | 13-14kgs/Sqm |
Product Description
Prefabricated System Running Track Red Rubber Running Track Runway
Product Parameters
Prefabricated System Running Track
Thickness: 9-15mm(recommend 13mm)
Length: 15m or 20m
Width: 1.22m
Color: red,blue and customized
Certificate: SGS/ISO
Base: cement or asphalt
Material: natural rubber
Usage: school,communities, stadium, training center
Service Life: 10 years.
Description of Surface Composition |
Thickness:13mm
|
|
Top Texture: | Indented Texture | |
Top Layer: |
Natural and Synthetic Rubber w/elastic inclusions,foamy,red-brown
|
|
Bottom Layer: |
Natural and Synthetic Rubber w/impressed 9mm±0.2mm slightly foamy, Black
|
9mm±0.2mm
|
Specifications
Product |
PU track |
||
Thickness |
13 mm or customized |
||
Force Reduction |
43 |
||
Tensile Strength |
1.56 |
||
Elongation at break |
92 |
||
Modified Vert. Deform. |
1.9 mm @ 23°C [75°F] |
||
Friction |
0.64/48 |
||
Material |
EPDM, SBR, Reclaimed Rubber, ETC. |
||
Features |
Environmental-friendly, UV-resistance, 5--10 years service time |
||
Market |
North America, Southeast Asia, Western Europe, Domestic Market |
||
Application |
Outdoor Rubber Track, Playground Sports Flooring,etc. |
||
More Test Data |
|||
Test Item |
Reference |
Standard Data |
Test Result |
Tensile |
IAAF |
≥0.5 |
1.56 |
Elongation at Break |
IAAF |
≥40 |
92 |
Force Reduction |
IAAF |
35-50 |
43 |
Vertical Deformation |
IAAF |
0.6-2.5 |
2.3 |
Skid Resistance |
IAAF |
≥47 |
60 |
Hardness Shore A |
GB/T 14833-2011 |
45-60° |
45-55° |
Fire Rating |
GB/T 14833-2011 |
I Degree |
I Degree |
Color Stability |
|
Good |
|
Chemical Resistance |
|
Good |
A: 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.
Sandwich sytem: EPDM broad be handwork,is professional than spray coat,most pouplar in the world market.
Full pour System: Best quality, bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.
Applications
- Applicable to all types of schools at all levels and professional stadium, athletics track, semicircle area, auxiliary area, fitness paths, indoor stadium training track, playground surfacing roads, indoor and outdoor track.
- Suitable for: Stadium, Sports ground, Sport center, Schools and Jogging park.
Our Services
Best service: Any inquiry will be replied in 24 hours. Timely and professional service all the time.
Best price: Reliable factory , direct selling,charming price for you!
Free sample: Provide free sample within 2kg, you just need to pay for the sample Express fee.
After-sale service: Provide free trainning lesson for our oversea distrubitor or buyer, professional product & construction knowledge for you.
Running Track
FAQ:
Q1: Are you a factory or a trade company?
A1: We are an industry and trade company.Welcome to China factory inspection.
Q2: What is thickness for the IAAF Running Track?
A2: The International Standard thickness is 13mm. Other sizes are available as your request.
Q3: Can we get installation support if we have no own constructors?
A3: We can send salesmen and technical support to your country to assist the installation.
Q4: Are your running track materials safety?
A4: Yes, our materials are safe. Environmentally friendly and recyclable.
Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Q6: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q7:What is the Production time?
A:It is about 10-15days.
Q8:What are the options for the base construction of a running track.?
A:The ground is based on asphalt or concrete.
Q9:What is the life Span for Running track?
A:The life span is about 10-15years.
Q10:I am Interested in Synthetic track surface,what is the best choice?
A: We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.
Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project
Sandwich system: EPDM broad be handwork,is professional than spray coat, enjoying great popular in the world market.
Full pour System: Best quality, Bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.
Prefabricated system: Is package by roll, Specification is 1.22*15m/20M, Strict request with base ground flat level. Professional for stadium international games. Like Olympic games.
Description
1.The upper layer is heat-vulcanized honeycomb base,with special structure angled in the direction of running,which differentiates the biomechanical response depending on the type stress generated by athletes.
2.The bottom layer has been specially designed to boost vertical deformation,giving athletes a sense of comfort while training.
3. Durable enough to bear abrasion,spike damage,ultra violet exposure,water,moisture and extremely weather condition.